Alternative strategies for energy recovery from municipal solid waste - Part B: Emission and cost estimates
This two-part paper assesses four strategies for energy recovery from Municipal Solid Waste (MSW) by dedicated Waste-To-Energy (WTE) plants. In strategy 1, the residue of Material Recovery (MR) is fed directly to a grate combustor, while in strategy 2 the grate combustor comes downstream of light mechanical treatment. In strategies 3 and 4, the MR residue is converted into Refuse Derived Fuel (RDF), in a fluidized cumbuster bed. The results of Part A, devoted to mass and energy balances, clearly show that pre-treating the MR residue in order to increase the heating value of the feedstock fed to the WTE plant has marginal effects on the energy efficiency of the WTE plant.
by Stefano Consonni Michele Giugliano M. Grosso
When considering the efficiency of the whole strategy of waste management, the energy balances show that the more thorough the pre-treatment, the smaller the amount of energy recovered per unit of MR residue. Starting from the heat/mass balances illustrated in Part A, Part B examines the environmental impacts and economics of the various strategies by means of a Life Cycle Assessment (LCA). Results show that treating the MR residues ahead of the WTE plant does not provide environmental or economic benefits. RDF production worsens almost all impact indicators because it reduces net electricity production and thus the displacement of power plant emissions; it also increases costs, because the benefits of improving the quality of the material fed to the WTE plant do not compensate the cost of such improvement.
Get full article here [external link]published: Waste Management 25(2):137-48, |
Keywords: Energy Recovery
Report on Experience in Dubai
Preventing Knowledge Loss, Securing the Future: The Role of Modern Technology in Maintenance – AI and Drone Technology in the Waste-to-Energy Plant
Preventing Knowledge Loss, Securing the Future: The Role of Modern Technology in Maintenance – AI and Drone Technology in the Waste-to-Energy Plant
Waste-to-Energy in Ethiopia – an Evaluation of the Reppie Plant in Addis Ababa
Thailand Waste Management Challenges
Improving Transparency and Optimizing Technical Processes at the WtE Plant Oberhausen
Experiences with Integrated Project Delivery (IPD)
Doʼs and Donʼts of Plant Engineering in Existing Buildings (Brown Field): Challenges and Lessons Learned in Refurbishment Projects
Developing Skilled Workers from Within: The Example of GMVA