Alternative strategies for energy recovery from municipal solid waste - Part A: Mass and energy balances
This two-part paper assesses four strategies for energy recovery from municipal solid waste (MSW) by dedicated waste-to-energy (WTE) plants generating electricity through a steam cycle.
by Stefano Consonni Michele Giugliano M. Grosso
The feedstock is the residue after materials recovery (MR), assumed to be 35% by weight of the collected MSW. In strategy 1, the MR residue is fed directly to a grate combustor. In strategy 2, the MR residue is first subjected to light mechanical treatment. In strategies 3 and 4, the MR residue is converted into RDF, which is combusted in a fluidized bed combustor. To examine the relevance of scale, we considered a small waste management system (WMS) serving 200,000 people and a large WMS serving 1,200,000 people. A variation of strategy 1 shows the potential of cogeneration with district heating. The assessment is carried out by a Life Cycle Analysis where the electricity generated by the WTE plant displaces electricity generated by fossil fuel-fired steam plants. Part A focuses on mass and energy balances, while Part B focuses on emissions and costs. Results show that treating the MR residue ahead of the WTE plant reduces energy recovery. The largest energy savings are achieved by combusting the MR residue "as is" in large scale plants; with cogeneration, primary energy savings can reach 2.5% of total societal energy use.
published: Waste Management 25(2):123-35 , |
Keywords: Energy Recovery
Report on Experience in Dubai
Preventing Knowledge Loss, Securing the Future: The Role of Modern Technology in Maintenance – AI and Drone Technology in the Waste-to-Energy Plant
Preventing Knowledge Loss, Securing the Future: The Role of Modern Technology in Maintenance – AI and Drone Technology in the Waste-to-Energy Plant
Waste-to-Energy in Ethiopia – an Evaluation of the Reppie Plant in Addis Ababa
Thailand Waste Management Challenges
Improving Transparency and Optimizing Technical Processes at the WtE Plant Oberhausen
Experiences with Integrated Project Delivery (IPD)
Doʼs and Donʼts of Plant Engineering in Existing Buildings (Brown Field): Challenges and Lessons Learned in Refurbishment Projects
Developing Skilled Workers from Within: The Example of GMVA